{"id":339,"date":"2022-07-15T09:19:53","date_gmt":"2022-07-15T09:19:53","guid":{"rendered":"https:\/\/arsglasstech.com\/blog\/?p=339"},"modified":"2022-07-15T09:19:58","modified_gmt":"2022-07-15T09:19:58","slug":"jharkhand-new-solar-policy-government-aims-to-achieve-4000-of-solar-power-in-next-5-years%ef%bf%bc","status":"publish","type":"post","link":"https:\/\/arsglasstech.com\/blog\/jharkhand-new-solar-policy-government-aims-to-achieve-4000-of-solar-power-in-next-5-years%ef%bf%bc\/","title":{"rendered":"JHARKHAND NEW SOLAR POLICY &#8211; GOVERNMENT AIMS TO ACHIEVE 4000 OF SOLAR POWER IN NEXT 5 YEARS\ufffc"},"content":{"rendered":"\n<p class=\"has-medium-font-size wp-block-paragraph\">Ranchi: Chief Minister Hemant Soren said on Tuesday that Jharkhand aspires to establish a capacity of <strong>4000 MW <\/strong>of <a href=\"https:\/\/arsglasstech.com\/blog\/worlds-largest-floating-solar-power-plant-the-top-4s\/\" data-type=\"URL\" data-id=\"https:\/\/arsglasstech.com\/blog\/worlds-largest-floating-solar-power-plant-the-top-4s\/\">solar power<\/a> in the next <strong>5 years<\/strong> and is ready to attracting investors in the field.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"800\" height=\"554\" src=\"https:\/\/arsglasstech.com\/blog\/wp-content\/uploads\/2022\/07\/SECI-Issues-EPC-Tender-for-a-100-MW-Floating-Solar-Project-in-Jharkhand.jpeg\" alt=\"\" class=\"wp-image-340\" srcset=\"https:\/\/arsglasstech.com\/blog\/wp-content\/uploads\/2022\/07\/SECI-Issues-EPC-Tender-for-a-100-MW-Floating-Solar-Project-in-Jharkhand.jpeg 800w, https:\/\/arsglasstech.com\/blog\/wp-content\/uploads\/2022\/07\/SECI-Issues-EPC-Tender-for-a-100-MW-Floating-Solar-Project-in-Jharkhand-300x208.jpeg 300w, https:\/\/arsglasstech.com\/blog\/wp-content\/uploads\/2022\/07\/SECI-Issues-EPC-Tender-for-a-100-MW-Floating-Solar-Project-in-Jharkhand-768x532.jpeg 768w\" sizes=\"auto, (max-width: 800px) 100vw, 800px\" \/><\/figure>\n\n\n\n<p class=\"has-medium-font-size wp-block-paragraph\">Jharkhand has solar energy potential due to its 300 days of clear sun and high solar insolation, taking this into consideration the chief minister announced certain plans to promote solar energy in Jharkhand.<\/p>\n\n\n\n<p class=\"has-medium-font-size wp-block-paragraph\">On Tuesday, Soren unveiled the Solar Energy Policy 2022 at a gathering in Ranchi, and lay the virtual foundation stone for a 600 KW capacity solar plant at Dhanbad and Dumka airports, as well as a grid-connected rooftop electricity plant for domestic consumers under the Giridih Solar City Scheme. According to the new policy, 4000 MW of solar energy generation is planned from 2022-2023 through 2026-27.<\/p>\n\n\n\n<p class=\"has-medium-font-size wp-block-paragraph\">According to the chief minister, the policy comprises a specialised solar power cell, legal approval within a maximum of 60 days, the establishment of 1,000 solar villages, schemes to encourage economically backward communities to use solar energy, and cross subsidies for it.<\/p>\n\n\n\n<p class=\"has-medium-font-size wp-block-paragraph\">Under the new policy, those living in cities with an annual income of less than Rs 3 lakh will be eligible for a subsidy of up to 80% of the entire installation cost for rooftop solar panels.<\/p>\n\n\n\n<p class=\"has-medium-font-size wp-block-paragraph\">Jharkhand issued its first Solar Power Policy in August 2015, with a goal of producing 2,650 MW of solar energy by 2020. In addition, it issued the &#8216;Jharkhand Solar Rooftop Policy, 2018&#8217; to encourage rooftop solar installations.<\/p>\n\n\n\n<p class=\"has-medium-font-size wp-block-paragraph\">However, due to factors such as land and incentive concerns, both attempts failed to attract private investment.<\/p>\n\n\n\n<p class=\"has-medium-font-size wp-block-paragraph\">Jharkhand Renewable Energy Development Agency (JREDA) has collaborated with the Council on Energy, Environment, and Water, a renowned non-profit policy research centre, to create the new policy in order to resolve the challenges.<\/p>\n\n\n\n<p class=\"has-medium-font-size wp-block-paragraph\">According to the strategy, there are three primary project categories &#8211; utility scale solar, distributed solar, and off-grid solar &#8211; with varied target generations, and solar plants are expected to be erected on public and private lands and bodies of water.<\/p>\n\n\n\n<p class=\"has-medium-font-size wp-block-paragraph\">The policy also proposed a dedicated Solar Policy Cell to be created under JREDA.<\/p>\n\n\n\n<figure class=\"wp-block-embed is-type-wp-embed is-provider-solar-blog wp-block-embed-solar-blog\"><div class=\"wp-block-embed__wrapper\">\n<div class=\"oceanwp-oembed-wrap clr\"><blockquote class=\"wp-embedded-content\" data-secret=\"xImzkcKSIh\"><a href=\"https:\/\/arsglasstech.com\/blog\/the-nations-biggest-floating-solar-power-project-is-now-ready-to-run-a-total-of-100mw-of-electricity-will-be-generated\/\">The Nation&#8217;s biggest Floating Solar Power Project Is Now ready to run: A total of 100MW of electricity will be generated.<\/a><\/blockquote><iframe loading=\"lazy\" class=\"wp-embedded-content\" sandbox=\"allow-scripts\" security=\"restricted\" style=\"position: absolute; clip: rect(1px, 1px, 1px, 1px);\" title=\"&#8220;&lt;strong&gt;The Nation&#8217;s biggest Floating Solar Power Project Is Now ready to run: A total of 100MW of electricity will be generated.&lt;\/strong&gt;&#8221; &#8212; Solar Blog\" src=\"https:\/\/arsglasstech.com\/blog\/the-nations-biggest-floating-solar-power-project-is-now-ready-to-run-a-total-of-100mw-of-electricity-will-be-generated\/embed\/#?secret=rBIvEZTREQ#?secret=xImzkcKSIh\" data-secret=\"xImzkcKSIh\" width=\"600\" height=\"338\" frameborder=\"0\" marginwidth=\"0\" marginheight=\"0\" scrolling=\"no\"><\/iframe><\/div>\n<\/div><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>Ranchi: Chief Minister Hemant Soren said on Tuesday that Jharkhand aspires to establish a capacity of 4000 MW of solar power in the next 5 years and is ready to attracting investors in the field. Jharkhand has solar energy potential due to its 300 days of clear sun and high solar insolation, taking this into [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":340,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[43,5,12],"class_list":["post-339","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized","tag-jreda","tag-solar","tag-solar-india","entry","has-media"],"_links":{"self":[{"href":"https:\/\/arsglasstech.com\/blog\/wp-json\/wp\/v2\/posts\/339","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/arsglasstech.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/arsglasstech.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/arsglasstech.com\/blog\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/arsglasstech.com\/blog\/wp-json\/wp\/v2\/comments?post=339"}],"version-history":[{"count":1,"href":"https:\/\/arsglasstech.com\/blog\/wp-json\/wp\/v2\/posts\/339\/revisions"}],"predecessor-version":[{"id":341,"href":"https:\/\/arsglasstech.com\/blog\/wp-json\/wp\/v2\/posts\/339\/revisions\/341"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/arsglasstech.com\/blog\/wp-json\/wp\/v2\/media\/340"}],"wp:attachment":[{"href":"https:\/\/arsglasstech.com\/blog\/wp-json\/wp\/v2\/media?parent=339"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/arsglasstech.com\/blog\/wp-json\/wp\/v2\/categories?post=339"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/arsglasstech.com\/blog\/wp-json\/wp\/v2\/tags?post=339"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}